What we look at
Your load and connection
We separate your steady daytime load, the equipment that drives your peak demand, and any second or third shift that solar cannot serve. That is what decides a sensible capacity, not the size of the shed.
A bill-based proposal designed around the plant, its connection, and its shifts.
Paso Solar designs industrial systems across the Bengaluru belt, from the machine shops of Peenya to the larger plots at Bommasandra, Jigani, Nelamangala, Dabaspet, Hoskote, and Attibele. The proposal is built around your connection, your shift pattern, and the roof or land you actually have.
What we look at
We separate your steady daytime load, the equipment that drives your peak demand, and any second or third shift that solar cannot serve. That is what decides a sensible capacity, not the size of the shed.
During installation
We plan the work around a running plant, with material movement, hot-work clearances, and short, notified shutdowns so production is not held up.
Each guide covers the industry mix, roof type, and load pattern of that estate.
A project specific to the applicant, connection, structure, and shift schedule, with the design and commercial assumptions clearly documented.
Industrial solar in the Bengaluru belt connects through BESCOM (Bangalore Electricity Supply Company). We prepare the feasibility application, single-line diagram, and metering paperwork, and coordinate the BESCOM inspection and commissioning. Larger HT systems may use net billing or gross metering rather than net metering, depending on sanctioned demand and category — we confirm the applicable arrangement before design.
We separate your steady daytime load, the equipment that drives your peak demand, and any second or third shift that solar cannot serve. That is what decides a sensible capacity, not the size of the shed.
We plan the work around a running plant, with material movement, hot-work clearances, and short, notified shutdowns so production is not held up.
Industrial solar in the Bengaluru belt connects through BESCOM (Bangalore Electricity Supply Company). We prepare the feasibility application, single-line diagram, and metering paperwork, and coordinate the BESCOM inspection and commissioning. Larger HT systems may use net billing or gross metering rather than net metering, depending on sanctioned demand and category — we confirm the applicable arrangement before design.
Group Net Metering may apply to multiple qualifying connections held by one eligible consumer. We review ownership, category, location, metering, allocation, and current utility requirements.
No. The usable area limits the layout, but the target connection, representative bills, recorded demand, shift pattern, and current approval limits determine a responsible capacity.
The drawings, test and commissioning records, structural sign-off, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, sanctioned demand, shift pattern, and basic site information.