What Paso Solar delivers in Jigani
A system designed for this plant, this connection, this shift pattern, and this building.
More of your load covered in daylight
We study the demand profile and power factor closely, because on a power-heavy HT connection the demand charge and PF penalty can be as large as the energy saving, and we confirm every input from the BESCOM bill.
A structurally safe rooftop or ground design
Roof space, adjacent open land, crane paths, and hot-work zones are assessed together so rooftop and ground-mount can be combined where it helps, and we check the sheeting for heat and fume exposure near the melting bay.
Installation that works around production
Hot-work permits, furnace schedules, and crane movements are built into the installation plan from the start, and we run the BESCOM net-metering process alongside the build.