One number to call
For a question during the project or a fault years later, you call us. We do not send you to a panel brand or a sub-contractor.
Survey, design, paperwork, installation, and the years after — all handled by Paso Solar.
Most solar problems start where one contractor's work ends and another's begins. We remove those handovers. One team designs your system, files every government form, installs it, commissions it, and stays on for support — with a single person accountable for the whole thing.
When a designer, an installer, an electrician, and a paperwork agent are all different people, the gaps between them become your problem. With Paso Solar they are the same people.
For a question during the project or a fault years later, you call us. We do not send you to a panel brand or a sub-contractor.
Because we designed, supplied, and installed the system, there is never a dispute about whose component or whose wiring caused an issue.
The paperwork, the structure, the wiring, and the meter are planned together from day one, not bolted on by whoever turns up next.
One proposal covers the whole job. You are not collecting separate bills for design, material, labour, and getting the approvals through.
Everything between your decision and a working system, and everything after.
We visit your property, measure the usable roof or land, check shading and the electrical connection, and review your bills to size the system correctly.
A system designed for your roof and usage, with a clear quote, the expected generation, and the assumptions behind the savings figure.
We take care of every form, drawing, fee, and follow-up with BESCOM, HESCOM, MESCOM, or your local DISCOM, and with the subsidy portal. You do not visit an office.
We source the panels, inverter, and mounting, run our own quality checks, and install with our trained team to electrical and safety standards.
We test the system, get it commissioned and the net meter installed, and hand over the records, warranties, and the monitoring app set up in your name.
Monitoring, service visits, and warranty claims are ours to manage. Home systems up to 10 kW get five years of comprehensive maintenance, included.
Every home solar system we install up to 10 kW comes with five years of comprehensive maintenance at no extra cost — scheduled visits, panel cleaning checks, inverter and wiring checks, generation review, and support when you need it. No annual contract to buy for the first five years.
Five stages, one team. You are told what is happening and what comes next at each one.
We assess your roof or land, shading, structure, and connection, and confirm the system will work before you commit.
You get a fixed quote, the system design, and a realistic view of generation, savings, and timeline.
We file the DISCOM and subsidy applications and bring the material to site, with quality checks before installation.
Our team installs the mounting, panels, inverter, wiring, and safety equipment, usually in two to three days for a home.
We commission the system, complete the meter change, hand over the records, and move into the support phase.
From a single home to a factory rooftop, delivered the same way.
Independent houses and villas. 5 years of comprehensive maintenance included.
Offices, showrooms, warehouses, schools, and hospitals.
Factories and large plants, rooftop and ground-mount.
Solar water pumps and farm power, with PM-KUSUM handled for you.
Yes, completely. We prepare and file the net metering application, the drawings, and the subsidy paperwork, pay the fees, attend the feasibility and inspection visits, and get the net meter installed. You do not visit any office or stand in any queue. Approval and the final subsidy amount are decided by the authority, but every step of the process is ours to run.
One person from our team owns your project from the first site visit to handover. The engineer who surveys your site stays with the project, so you are never re-explaining things to someone new.
You call us, not a panel brand or a separate contractor. Because we designed, supplied, and installed the system, there is no argument about whose part failed. For home systems up to 10 kW, the first five years of comprehensive maintenance are included.
The installation itself is usually two to three days for a home. The full timeline, including the DISCOM approval and the meter change, depends on the utility queue and is confirmed for you after the site survey.
In many cases, yes. We begin with a site and documentation review to see what is already in place and what needs correcting before we can put our name to it.
Yes. We deliver residential, commercial, industrial, and agricultural solar projects across Karnataka, including Hubballi, Dharwad, and the North Karnataka belt.
Share your latest electricity bill and roof or site details. We will come back with a system design, a fixed quote, and a clear plan.