What Paso Solar delivers in Hoskote
A system designed for this plant, this connection, this shift pattern, and this building.
More of your load covered in daylight
We check the shift pattern and the split between process load and building services to see how much generation is used on site versus exported, and confirm the sanctioned demand and power factor from the BESCOM bill.
A structurally safe rooftop or ground design
PEB roof capacity, sheeting age, fall-arrest provision, and skylight layout are checked before the capacity is fixed, and we mark the walkways and service zones the layout must keep clear.
Installation that works around production
Work is planned around dispatch bays and staff shift changes, with lifting and roof access in agreed windows, and we manage the BESCOM net-metering application and meter change.