Bill and demand basis
We use your HT or LT bills and shift pattern, and show which units and how much of the demand charge the system is expected to replace.
A proposal built around your HT bill, your peak demand, and the roof or land you have.
Paso Solar builds each proposal from your real bills, demand profile, and site, so the capacity, the saving on energy and demand charges, and the GNM and depreciation position are all backed by your own numbers rather than a template.
We turn your connection, load, and property conditions into a documented project scope.
We use your HT or LT bills and shift pattern, and show which units and how much of the demand charge the system is expected to replace.
We confirm the consumer, every connection in scope, how generation is allocated, the metering, and the current utility requirements.
We check the roof load margin, sheet and purlin condition, wind loading, shade, and adjacent land for ground-mount.
We set out the equipment, any preparation work, DISCOM support, depreciation inputs, warranty and AMC cover, exclusions, and charges separately.
Choose a city for load and site-planning guidance by industrial area.
Paso Solar designs industrial systems across the Bengaluru belt, from the machine shops of Peenya to the larger plots at Bommasandra, Jigani, Nelamangala, Dabaspet, Hoskote, and Attibele. The proposal is built around your connection, your shift pattern, and the roof or land you actually have.
7 area guidesPaso Solar sizes industrial systems in Hubballi from your actual consumption and measured roof or land, whether the unit sits in Tarihal, the Gokul Road industrial area, or Belur. Engineering, food processing, and agro units here often carry a heavy daytime motor load that solar is a good match for.
3 area guidesPaso Solar gives Dharwad units at Belur, Rayapur, Lakamanahalli, and Mummigatti a system matched to their own load and property. Larger KIADB plots here often suit rooftop and adjacent ground-mount together.
3 area guidesPaso Solar works with the foundry and precision-engineering cluster around Belagavi, including Udyambag, Machhe, and Auto Nagar. These are power-heavy units where the demand charge and the power-factor penalty matter as much as the energy bill.
3 area guidesThe proposal shows every assumption behind the numbers: your tariff, expected generation, how much you use directly, demand-charge reduction, power-factor gain, tariff escalation, depreciation, and maintenance.
Your recent HT or LT bills, the recorded maximum demand, the power factor, operating shifts, any defined future load, site access, and the roof or land available.
Yes. We work out the route from your consumer category, connection, capacity, and metering, coordinate the technical approvals and inspection, and set out exactly what we handle in the proposal.
GNM may apply when one eligible consumer holds several qualifying connections, so a single plant can reduce more than one bill. Ownership, category, plant location, allocation, metering, and current utility rules all need checking first.
We keep the depreciation benefit separate from the energy savings in the numbers, and give your qualified tax adviser the project details to confirm what applies to your entity.
The bills and tariff it is based on, the structural and layout basis, generation assumptions, the equipment, any preparation work, exclusions, DISCOM support, the work plan, and the commissioning, monitoring, and service terms.
Share recent bills, sanctioned demand, shift pattern, and basic site information.