More of your load covered in daylight
We model the base load from moulding, compressed air, and machining, and check the power factor on the BESCOM bill, which is often where a quick additional saving sits alongside the energy offset.
Solar planned around the plant meter, the shift pattern, and the usable roof or land.
Paso Solar supports the auto-component, plastics, and engineering units around the Attibele industrial area near the Tamil Nadu border, where moulding machines, compressors, and machine tools carry a steady daytime load tied to production.
A system designed for this plant, this connection, this shift pattern, and this building.
We model the base load from moulding, compressed air, and machining, and check the power factor on the BESCOM bill, which is often where a quick additional saving sits alongside the energy offset.
Shed roofs, chiller yards, compressor rooms, and material-storage areas are assessed so the layout leaves operations clear, and we check the roof structure and sheeting condition before fixing capacity.
We coordinate around moulding schedules and tool changes so the shopfloor keeps running through installation, and run the BESCOM approvals in parallel with the build.
Your proposal
It sets out the savings basis across energy and demand charges, the GNM review where relevant, who is responsible for what, DISCOM support, depreciation inputs, and the service cover for the proposed system.
Moulding machines and chillers run through the day, so solar offsets a large part of that load directly while it is generating. We also check whether inverter reactive support can lift your power factor and cut that penalty, and show both effects separately on an estimated bill so you can see where the saving comes from.
No. The usable area limits the layout, while the target connection, representative bills, recorded demand, shift pattern, and current approval conditions determine a responsible capacity.
It can, where the system generates through the hours your plant records its peak. The estimate shows the demand-charge reduction separately from the energy saving, because the two do not always move together.
The drawings, test and commissioning records, structural sign-off, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, sanctioned demand, shift pattern, and basic site information.