More of your load covered in daylight
We identify the daytime base load and seasonal peaks from the HESCOM bill, so a unit that runs harder in one part of the year is sized on real data rather than a flat annual average.
Solar planned around the plant meter, the shift pattern, and the usable roof or land.
Paso Solar designs systems for the engineering, food-processing, and agro units in the Tarihal industrial estate near Hubballi, where the daytime motor load on presses, pumps, and processing lines is a good match for rooftop solar.
A system designed for this plant, this connection, this shift pattern, and this building.
We identify the daytime base load and seasonal peaks from the HESCOM bill, so a unit that runs harder in one part of the year is sized on real data rather than a flat annual average.
Roof type, span, condition, and any adjacent land are checked on site, along with the sheeting age, the structural margin, dust from the estate roads, and the distance from the roof to the metering point where the system ties in.
We schedule around processing seasons and dispatch so the line is not stopped for the installation, and handle the HESCOM net-metering application, documentation, and meter change from start to activation.
Your proposal
It sets out the savings basis across energy and demand charges, the GNM review where relevant, who is responsible for what, DISCOM support, depreciation inputs, and the service cover for the proposed system.
We take the low-season months from your bills and operating calendar into the estimate, so the projected saving does not assume the plant runs at full load every month of the year. A system sized this way still covers the busy months well.
No. The usable area limits the layout, while the target connection, representative bills, recorded demand, shift pattern, and current approval conditions determine a responsible capacity.
It can, where the system generates through the hours your plant records its peak. The estimate shows the demand-charge reduction separately from the energy saving, because the two do not always move together.
The drawings, test and commissioning records, structural sign-off, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, sanctioned demand, shift pattern, and basic site information.