More of your load covered in daylight
We match the HESCOM bill to the target meter and separate any office, godown, or workshop consumption where several uses share the premises, so the recommended capacity reflects the industrial load alone.
Solar planned around the plant meter, the shift pattern, and the usable roof or land.
Paso Solar works with the mixed light-industry, packaging, printing, and engineering units in the Gokul Road industrial area of Hubballi, close to the IT park and the arterial road, where premises often carry more than one type of use.
A system designed for this plant, this connection, this shift pattern, and this building.
We match the HESCOM bill to the target meter and separate any office, godown, or workshop consumption where several uses share the premises, so the recommended capacity reflects the industrial load alone.
Roof access, sheeting condition, service clearances, shade from neighbouring units, and material movement along the internal roads need an on-site plan rather than an assumption from the plot size, and we check the structure before fixing capacity.
The proposal covers isolation, shutdown coordination, safety equipment, monitoring, and handover records for the selected connection, and we run the HESCOM net-metering application, documentation, and meter change ourselves.
Your proposal
It sets out the savings basis across energy and demand charges, the GNM review where relevant, who is responsible for what, DISCOM support, depreciation inputs, and the service cover for the proposed system.
We can review a multi-connection structure where the consumer name, meter category, and current HESCOM rules support Group Net Metering. The proposal states clearly which meters it covers and which it does not, so there is no surprise at billing.
No. The usable area limits the layout, while the target connection, representative bills, recorded demand, shift pattern, and current approval conditions determine a responsible capacity.
It can, where the system generates through the hours your plant records its peak. The estimate shows the demand-charge reduction separately from the energy saving, because the two do not always move together.
The drawings, test and commissioning records, structural sign-off, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, sanctioned demand, shift pattern, and basic site information.