More of your load covered in daylight
We size from the HT bill, the recorded demand, and the shift load, treat any confirmed line expansion as a separate future case, and state the tariff and consumption behind every figure.
Solar planned around the plant meter, the shift pattern, and the usable roof or land.
Paso Solar designs sizeable systems for the auto, engineering, and FMCG units in the Belur industrial area on the Hubballi-Dharwad belt, one of the larger estates in the region, where wide sheds and open plots allow larger rooftop and ground-mount installations.
A system designed for this plant, this connection, this shift pattern, and this building.
We size from the HT bill, the recorded demand, and the shift load, treat any confirmed line expansion as a separate future case, and state the tariff and consumption behind every figure.
Shed spans, roof condition, crane bays, dust exposure, and open land for ground-mount are assessed together, along with the soil and drainage where a ground frame is proposed and the cable route back to a single inverter room.
Structural preparation, if any, is scheduled apart from the electrical work, shutdowns are timed to your maintenance windows, and we manage the HESCOM net-metering application, documentation, and meter change through to commissioning.
Your proposal
It sets out the savings basis across energy and demand charges, the GNM review where relevant, who is responsible for what, DISCOM support, depreciation inputs, and the service cover for the proposed system.
We complete the electrical and structural design, define the scope, run the full HESCOM process, install and test the system, and hand over the drawings, test records, and monitoring access with a clear service plan.
No. The usable area limits the layout, while the target connection, representative bills, recorded demand, shift pattern, and current approval conditions determine a responsible capacity.
It can, where the system generates through the hours your plant records its peak. The estimate shows the demand-charge reduction separately from the energy saving, because the two do not always move together.
The drawings, test and commissioning records, structural sign-off, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, sanctioned demand, shift pattern, and basic site information.