More of your load covered in daylight
We size from the HESCOM HT bill, the demand profile, and the shift pattern, and separate the melting or heat-treatment base load from shift-based machining so the capacity fits the load that runs in daylight.
Solar planned around the plant meter, the shift pattern, and the usable roof or land.
Paso Solar designs larger systems for the auto-component, casting, and precision-engineering units in the Machhe KIADB industrial area of Belagavi, where wider plots and sheds support sizeable rooftop and ground-mount installations.
A system designed for this plant, this connection, this shift pattern, and this building.
We size from the HESCOM HT bill, the demand profile, and the shift pattern, and separate the melting or heat-treatment base load from shift-based machining so the capacity fits the load that runs in daylight.
Shed spans, roof condition, crane bays, dust exposure, and open land for ground-mount are assessed on site, along with soil, drainage, and the cable route back to the inverter room.
Structural preparation is scheduled apart from the electrical work, interconnection is timed to a planned maintenance window, and we run the HESCOM application and meter change.
Your proposal
It sets out the savings basis across energy and demand charges, the GNM review where relevant, who is responsible for what, DISCOM support, depreciation inputs, and the service cover for the proposed system.
Only if the roof or land, the inverter and cable design, the HESCOM connection limit, and the approvals allow it. If expansion is likely, we design the first phase with that in mind and say clearly what roof area, cable capacity, and inverter headroom are reserved for it.
No. The usable area limits the layout, while the target connection, representative bills, recorded demand, shift pattern, and current approval conditions determine a responsible capacity.
It can, where the system generates through the hours your plant records its peak. The estimate shows the demand-charge reduction separately from the energy saving, because the two do not always move together.
The drawings, test and commissioning records, structural sign-off, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, sanctioned demand, shift pattern, and basic site information.