More of your load covered in daylight
We study the demand charge, the power factor, and the daytime load together from the HESCOM bill, since a well-designed system can act on all three rather than the units consumed alone.
Solar planned around the plant meter, the shift pattern, and the usable roof or land.
Paso Solar supports the automotive-casting and forging units in the Auto Nagar cluster of Belagavi, where electricity is one of the largest input costs and the demand charge and power-factor penalty carry real weight on the monthly bill.
A system designed for this plant, this connection, this shift pattern, and this building.
We study the demand charge, the power factor, and the daytime load together from the HESCOM bill, since a well-designed system can act on all three rather than the units consumed alone.
Roof heat and dust from the furnaces, the structural margin of older sheds, and cleaning access are checked, and adjacent land is assessed for a ground frame where the roof alone is not enough.
We coordinate around furnace and forging schedules so production is not interrupted, keep shutdowns short and notified, and manage the HESCOM net-metering application, documentation, and meter change.
Your proposal
It sets out the savings basis across energy and demand charges, the GNM review where relevant, who is responsible for what, DISCOM support, depreciation inputs, and the service cover for the proposed system.
It can cover a meaningful share of your daytime units at a fixed cost, trim the monthly demand charge if it generates through your peak, and improve the power factor. We put a number against each of these from your own bills before you decide.
No. The usable area limits the layout, while the target connection, representative bills, recorded demand, shift pattern, and current approval conditions determine a responsible capacity.
It can, where the system generates through the hours your plant records its peak. The estimate shows the demand-charge reduction separately from the energy saving, because the two do not always move together.
The drawings, test and commissioning records, structural sign-off, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, sanctioned demand, shift pattern, and basic site information.