What we look at
Your load and connection
We look at the full HT bill, the recorded maximum demand, and the power factor, because a well-designed system can act on all three, not just the units consumed.
A bill-based proposal designed around the plant, its connection, and its shifts.
Paso Solar works with the foundry and precision-engineering cluster around Belagavi, including Udyambag, Machhe, and Auto Nagar. These are power-heavy units where the demand charge and the power-factor penalty matter as much as the energy bill.
What we look at
We look at the full HT bill, the recorded maximum demand, and the power factor, because a well-designed system can act on all three, not just the units consumed.
During installation
We coordinate around furnace and machine-shop schedules, with shutdowns timed to maintenance windows so casting and machining are not interrupted.
Each guide covers the industry mix, roof type, and load pattern of that estate.
A project specific to the applicant, connection, structure, and shift schedule, with the design and commercial assumptions clearly documented.
Industrial solar in Belagavi connects through HESCOM (Hubli Electricity Supply Company). We prepare the feasibility application, single-line diagram, and metering paperwork, and coordinate the HESCOM inspection and commissioning. Larger HT systems may use net billing or gross metering rather than net metering, depending on sanctioned demand and category — we confirm the applicable arrangement before design.
We look at the full HT bill, the recorded maximum demand, and the power factor, because a well-designed system can act on all three, not just the units consumed.
We coordinate around furnace and machine-shop schedules, with shutdowns timed to maintenance windows so casting and machining are not interrupted.
Industrial solar in Belagavi connects through HESCOM (Hubli Electricity Supply Company). We prepare the feasibility application, single-line diagram, and metering paperwork, and coordinate the HESCOM inspection and commissioning. Larger HT systems may use net billing or gross metering rather than net metering, depending on sanctioned demand and category — we confirm the applicable arrangement before design.
Group Net Metering may apply to multiple qualifying connections held by one eligible consumer. We review ownership, category, location, metering, allocation, and current utility requirements.
No. The usable area limits the layout, but the target connection, representative bills, recorded demand, shift pattern, and current approval limits determine a responsible capacity.
The drawings, test and commissioning records, structural sign-off, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, sanctioned demand, shift pattern, and basic site information.