More of your load covered in daylight
We size from the HT bill and demand profile, model confirmed future load as a separate case so the first system is not oversized, and state the tariff and consumption behind each figure.
Solar planned around the plant meter, the shift pattern, and the usable roof or land.
Paso Solar designs systems for the newer, larger-plot units in the Mummigatti KIADB industrial area near Dharwad, part of the district's industrial expansion, where rooftop and ground-mount often work together on one connection.
A system designed for this plant, this connection, this shift pattern, and this building.
We size from the HT bill and demand profile, model confirmed future load as a separate case so the first system is not oversized, and state the tariff and consumption behind each figure.
Shed roofs, open plots, soil and drainage for ground frames, shade from the boundary, and the route to the metering point are assessed together, and we check the sheeting and structure before any capacity is fixed.
Civil work for ground-mount, where used, runs in parallel with roof work, and the HESCOM net-metering steps are tracked to commissioning so the civil, electrical, and utility schedules meet at handover.
Your proposal
It sets out the savings basis across energy and demand charges, the GNM review where relevant, who is responsible for what, DISCOM support, depreciation inputs, and the service cover for the proposed system.
Where you have unused land beside the shed, yes. We compare rooftop-only against a combined rooftop and ground-mount design and show the generation, the area, and the cost of each so you can choose on the numbers.
No. The usable area limits the layout, while the target connection, representative bills, recorded demand, shift pattern, and current approval conditions determine a responsible capacity.
It can, where the system generates through the hours your plant records its peak. The estimate shows the demand-charge reduction separately from the energy saving, because the two do not always move together.
The drawings, test and commissioning records, structural sign-off, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, sanctioned demand, shift pattern, and basic site information.