More of your load covered in daylight
We separate refrigeration, boiler, and packing loads by when they run, using the HESCOM bill and the operating calendar, so the system serves the part of the day that carries the cost rather than a flat average.
Solar planned around the plant meter, the shift pattern, and the usable roof or land.
Paso Solar works with the food-processing, agro, and SME units in the Lakamanahalli industrial estate of Dharwad, where refrigeration, boilers, and packing lines carry the load and much of it runs while the sun is up.
A system designed for this plant, this connection, this shift pattern, and this building.
We separate refrigeration, boiler, and packing loads by when they run, using the HESCOM bill and the operating calendar, so the system serves the part of the day that carries the cost rather than a flat average.
Roof condition, cold-store insulation loading on the structure, exhaust and vent layout, and adjacent land for a ground frame are assessed on site, along with the cable route to the metering point.
We schedule around processing shifts and cold-chain constraints so temperature-controlled stock is not put at risk, and run the HESCOM net-metering application and meter change.
Your proposal
It sets out the savings basis across energy and demand charges, the GNM review where relevant, who is responsible for what, DISCOM support, depreciation inputs, and the service cover for the proposed system.
Refrigeration compressors carry a large daytime load that solar offsets well while the sun is up, so a day-running cold store is a good match. Overnight holding still draws from the grid unless a separate battery or generator backup is designed, which we assess as its own requirement.
No. The usable area limits the layout, while the target connection, representative bills, recorded demand, shift pattern, and current approval conditions determine a responsible capacity.
It can, where the system generates through the hours your plant records its peak. The estimate shows the demand-charge reduction separately from the energy saving, because the two do not always move together.
The drawings, test and commissioning records, structural sign-off, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, sanctioned demand, shift pattern, and basic site information.