More useful daytime generation
We connect ownership, roof authority, current operating demand, and any approved future load to a suitable capacity and project structure, using representative HESCOM bills.
Solar planned around the business meter, operating day, and usable site.
Sattur, on the highway side of Dharwad near the industrial area and several colleges, has newer commercial plots and buildings, from offices and showrooms to institutional premises on larger sites. Paso Solar brings the property permissions and the technical feasibility together into one clear commercial project scope.
A commercial system designed for this business, connection, operating schedule, and property.
We connect ownership, roof authority, current operating demand, and any approved future load to a suitable capacity and project structure, using representative HESCOM bills.
Our survey marks the private and any shared roof zones, access for material and equipment, shade, the inverter and safety-equipment positions, and where the system ties into the grid. Larger Sattur plots often allow a clean single-array layout, and some suit a rooftop and a parking-canopy array together.
The implementation plan covers work permissions, occupant communication, monitoring ownership, warranty records, and maintenance access, with the HESCOM application, documentation, and meter change managed by us.
Your proposal
It sets out the savings basis, the GNM review where relevant, who is responsible for what, utility support, tax inputs, and the service cover for the proposed system.
We complete the electrical and layout design, define the scope, run the HESCOM net-metering process, install and test the system, and hand over the agreed records.
No. Usable area limits the layout, while the target connection, representative bills, operating hours, sanctioned load, and current approval conditions determine a responsible capacity.
Yes, as a separately designed requirement. We assess essential loads, backup duration, battery or generator integration, controls, and operating responsibility because a standard on-grid plant shuts down during an outage.
We provide the relevant drawings, test and commissioning records, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, operating hours, connection details, and basic site information.