Consumption and tariff basis
We use your recent bills and operating schedule, and show which units the system is expected to replace.
A proposal built around your connection, your working hours, and the roof you actually have.
Paso Solar builds each proposal from your real bills, load, and site, so the capacity, the savings estimate, and the GNM and tax position are all backed by your own numbers rather than a template.
We turn the business connection, operating load, and property conditions into a documented project scope.
We use your recent bills and operating schedule, and show which units the system is expected to replace.
We confirm the consumer, every connection in scope, how generation is allocated, the metering, and the current utility requirements.
We measure the usable space, shade, access, and structure, and check the wiring, earthing, and where the system connects.
We set out the equipment, any preparation work, approvals support, tax assumptions, warranty and AMC cover, exclusions, and charges separately.
Choose a city for business-load and site-planning guidance.
Paso Solar designs commercial systems in Bengaluru around the power a business actually uses during daylight, the air-conditioning, lighting, and equipment that run through the working day. You get a clear proposal showing the connection, the capacity that fits, the usable roof, and how much of your daytime grid use it can replace.
9 area guidesPaso Solar sizes commercial systems in Hubli from your actual consumption and measured roof or land, not a standard package based on business type. Where your load is heaviest during the day is where solar saves the most, and the proposal is built around that.
6 area guidesPaso Solar gives Dharwad businesses a system matched to their own consumption and property. Shops, institutions, offices, and mixed-use buildings receive designs based on their different daytime loads and site conditions.
4 area guidesThe proposal shows every assumption behind the numbers: your tariff, expected generation, how much you use directly, export, downtime, tariff escalation, tax, and maintenance.
Your recent electricity bills, the connection and load details, operating hours, any defined future loads, site access, and the roof or land available.
Yes. We work out the right route from your consumer category, connection, project type, area, capacity, and metering, then set out exactly what we handle in the proposal.
GNM may apply when one eligible consumer holds several qualifying connections, so a single plant can reduce more than one bill. Ownership, category, plant location, allocation, metering, and current utility requirements all need checking first.
We keep the tax benefit separate from the energy savings in the numbers, and give your qualified tax adviser the project details to confirm what applies.
The bill and tariff it is based on, the layout and generation assumptions, the equipment, any preparation work, exclusions, approvals support, the work plan, and the commissioning, monitoring, and service terms.
Share recent bills, operating hours, connection details, and basic site information.