More useful daytime generation
We reconcile recent HESCOM consumption with the operating days, equipment, tenants, and common services to build a current load model before recommending capacity.
Solar planned around the business meter, operating day, and usable site.
Malmaddi is an established part of old Dharwad, near the town centre, with offices, clinics, and shops in buildings that have been extended and re-occupied over the years. Paso Solar designs a commercial solar system from current measurements and present use, not from how the building started.
A commercial system designed for this business, connection, operating schedule, and property.
We reconcile recent HESCOM consumption with the operating days, equipment, tenants, and common services to build a current load model before recommending capacity.
Our survey records aged roof surfaces, later construction, water tanks, shade from the older street, access paths for material, and the switchboard, panel, and cable condition, so the layout suits the roof as it is and any preparation is identified up front.
We coordinate any waterproofing, civil, or electrical work with the solar schedule to reduce foreseeable dismantling, and run the HESCOM application, documentation, and meter change end to end.
Your proposal
It sets out the savings basis, the GNM review where relevant, who is responsible for what, utility support, tax inputs, and the service cover for the proposed system.
Usually yes, once the surface, waterproofing, and structure are checked. Where the module area needs work, we complete or schedule it first so panels are not disturbed later.
No. Usable area limits the layout, while the target connection, representative bills, operating hours, sanctioned load, and current approval conditions determine a responsible capacity.
Yes, as a separately designed requirement. We assess essential loads, backup duration, battery or generator integration, controls, and operating responsibility because a standard on-grid plant shuts down during an outage.
We provide the relevant drawings, test and commissioning records, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, operating hours, connection details, and basic site information.