More useful daytime generation
We use current BESCOM bills for the base design and model confirmed additions, such as new floors, tenants, cooling, or EV charging, as separate future cases, so you are not sized for demand that does not exist yet.
Solar planned around the business meter, operating day, and usable site.
Sarjapur Road is one of Bengaluru's fastest-growing office corridors, with tech parks, coworking spaces, schools, and hospitals in newer buildings that often have room to expand. Paso Solar gives a growing campus a phased solar plan that serves today's demand without blocking credible future growth.
A commercial system designed for this business, connection, operating schedule, and property.
We use current BESCOM bills for the base design and model confirmed additions, such as new floors, tenants, cooling, or EV charging, as separate future cases, so you are not sized for demand that does not exist yet.
Newer roofs and larger plots along the corridor often allow a rooftop array and a parking-canopy array together. Our site plan coordinates current roofs, planned structures, access roads, and space for the electrical system to grow.
Each phase has a defined load, installation area, and commissioning outcome, with a clear path for later engineering review or a further BESCOM application as the campus grows.
Your proposal
It sets out the savings basis, the GNM review where relevant, who is responsible for what, utility support, tax inputs, and the service cover for the proposed system.
Not necessarily. We can design for current demand now and reserve practical roof and electrical provision for later phases, as long as the expansion plan is defined enough to plan around.
No. Usable area limits the layout, while the target connection, representative bills, operating hours, sanctioned load, and current approval conditions determine a responsible capacity.
Yes, as a separately designed requirement. We assess essential loads, backup duration, battery or generator integration, controls, and operating responsibility because a standard on-grid plant shuts down during an outage.
We provide the relevant drawings, test and commissioning records, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, operating hours, connection details, and basic site information.