More useful daytime generation
We confirm which BESCOM connection the system serves and reconcile the business hours, cooling, lighting, and any shared-building charges before projecting how much grid import the solar can offset.
Solar planned around the business meter, operating day, and usable site.
Jayanagar is one of Bengaluru's oldest planned commercial areas, with retail, jewellery and textile showrooms, clinics, and banks around 4th Block, 11th Main, and the shopping complex, mostly in long-held, family-owned buildings. Paso Solar sets a clear project boundary and designs around the business load that will use the system.
A commercial system designed for this business, connection, operating schedule, and property.
We confirm which BESCOM connection the system serves and reconcile the business hours, cooling, lighting, and any shared-building charges before projecting how much grid import the solar can offset.
Older Jayanagar terraces carry tanks, stair heads, and later additions. Our layout balances shade, safe access, and maintainability rather than filling every clear patch, and keeps essential roof use available to the building.
We coordinate roof responsibility, shutdown windows, and access across the owner, the business, and any building association, and handle the BESCOM net-metering process from application to activation.
Your proposal
It sets out the savings basis, the GNM review where relevant, who is responsible for what, utility support, tax inputs, and the service cover for the proposed system.
It may be possible through Group Net Metering, subject to the consumer category, how the connections are held, and current BESCOM requirements. We confirm the eligible structure before it goes into the design.
No. Usable area limits the layout, while the target connection, representative bills, operating hours, sanctioned load, and current approval conditions determine a responsible capacity.
Yes, as a separately designed requirement. We assess essential loads, backup duration, battery or generator integration, controls, and operating responsibility because a standard on-grid plant shuts down during an outage.
We provide the relevant drawings, test and commissioning records, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, operating hours, connection details, and basic site information.