Roof and shade
Roof shape, shared restrictions, tanks, utility zones, and neighbouring shade can affect how much area remains practical for modules.
Rooftop solar planned for the home and connection that will use it.
For Sattur homes, we develop the solar design around confirmed private roof rights, the target household meter, and property-level access rules.
Paso Solar handles the property survey, design, installation, applicable utility support, testing, and handover.
A villa or independent home with changing cooling, work-from-home, or charging loads needs present and future demand shown separately.
Roof shape, shared restrictions, tanks, utility zones, and neighbouring shade can affect how much area remains practical for modules.
We distinguish current bill-supported capacity from optional future scenarios instead of adding every possible appliance to the initial system.
The proposal sets the private installation boundary, the inverter and safety-equipment positions, monitoring, and a way to service the panels.
Our Approach
We keep technical feasibility separate from property permission and do not present roof access or owner approval as automatic in the Sattur proposal.
Final suitability depends on the property, roof rights, target electricity connection, and safe installation access.
Rooftop solar in Dharwad connects through HESCOM (Hubli Electricity Supply Company). We handle the feasibility application, single-line diagram, and net-metering documentation, and coordinate the HESCOM site inspection and meter change. Karnataka allows residential net metering up to the sanctioned load or 10 kW, whichever is lower.
For eligible homes we check and file the PM Surya Ghar: Muft Bijli Yojana subsidy — currently ₹30,000 per kW up to 2 kW and ₹18,000 for the third kW, capped at ₹78,000 for a 3 kW or larger system. Eligibility and the final amount are decided under the scheme.
Continue with property guidance for nearby Hubli-Dharwad areas.
Practical answers about our survey, proposal, utility support, installation, and handover.
Yes, where shared access or community conditions apply. The owner should confirm permissions while we assess the private roof, electrical connection, and installation method.
Only when the homeowner defines essential circuits and expected backup duration. A standard on-grid system and a hybrid or battery system address different requirements.
Rooftop solar in Dharwad connects through HESCOM (Hubli Electricity Supply Company). We handle the feasibility application, single-line diagram, and net-metering documentation, and coordinate the HESCOM site inspection and meter change. Karnataka allows residential net metering up to the sanctioned load or 10 kW, whichever is lower.
For eligible homes we check and file the PM Surya Ghar: Muft Bijli Yojana subsidy — currently ₹30,000 per kW up to 2 kW and ₹18,000 for the third kW, capped at ₹78,000 for a 3 kW or larger system. Eligibility and the final amount are decided under the scheme.
We test and commission the system, provide monitoring access and relevant project records, explain safe operation, and confirm the agreed warranty and support process.
Share the target electricity bill and property details. Our team will review them before recommending the next step.