Roof and shade
Future extensions, tank positions, access paths, and nearby construction can alter which roof zone will remain dependable over the system life.
Rooftop solar planned for the home and connection that will use it.
For Lakamanahalli homes, we protect roof space required for confirmed future construction and utilities before defining the solar layout.
Paso Solar handles the property survey, design, installation, applicable utility support, testing, and handover.
We discuss additional floors, rooms, pumps, cooling, and vehicle charging as separate roof and consumption decisions rather than one general growth assumption.
Future extensions, tank positions, access paths, and nearby construction can alter which roof zone will remain dependable over the system life.
Current bills establish the base requirement, while confirmed future equipment is modelled transparently instead of being hidden in an oversized package.
The design records which roof areas are permanent and which are reserved, plus the mounting, inverter protection, cable path, and later service access.
Our Approach
We identify permanent roof area from confirmed construction plans and can complete feasibility now while deferring final design where the roof is likely to change.
Final suitability depends on the property, roof rights, target electricity connection, and safe installation access.
Rooftop solar in Dharwad connects through HESCOM (Hubli Electricity Supply Company). We handle the feasibility application, single-line diagram, and net-metering documentation, and coordinate the HESCOM site inspection and meter change. Karnataka allows residential net metering up to the sanctioned load or 10 kW, whichever is lower.
For eligible homes we check and file the PM Surya Ghar: Muft Bijli Yojana subsidy — currently ₹30,000 per kW up to 2 kW and ₹18,000 for the third kW, capped at ₹78,000 for a 3 kW or larger system. Eligibility and the final amount are decided under the scheme.
Continue with property guidance for nearby Hubli-Dharwad areas.
Practical answers about our survey, proposal, utility support, installation, and handover.
Only when the extension will not affect the roof zone, access, meter, or cable route. We review the confirmed plan before advising whether installation should proceed or wait.
Include them when quantity, rating, and likely use are reasonably known. We show their effect separately from the capacity supported by present bills.
Rooftop solar in Dharwad connects through HESCOM (Hubli Electricity Supply Company). We handle the feasibility application, single-line diagram, and net-metering documentation, and coordinate the HESCOM site inspection and meter change. Karnataka allows residential net metering up to the sanctioned load or 10 kW, whichever is lower.
For eligible homes we check and file the PM Surya Ghar: Muft Bijli Yojana subsidy — currently ₹30,000 per kW up to 2 kW and ₹18,000 for the third kW, capped at ₹78,000 for a 3 kW or larger system. Eligibility and the final amount are decided under the scheme.
We test and commission the system, provide monitoring access and relevant project records, explain safe operation, and confirm the agreed warranty and support process.
Share the target electricity bill and property details. Our team will review them before recommending the next step.