What we look at
Your load and connection
We identify stable daytime consumption, seasonal changes, cooling or equipment demand, and loads reserved for backup. This produces a more realistic generation and savings case.
A bill-based proposal designed around the property and its operating day.
Paso Solar sizes commercial systems in Hubli from your actual consumption and measured roof or land, not a standard package based on business type. Where your load is heaviest during the day is where solar saves the most, and the proposal is built around that.
What we look at
We identify stable daytime consumption, seasonal changes, cooling or equipment demand, and loads reserved for backup. This produces a more realistic generation and savings case.
During installation
Our scope brings roof preparation, electrical readiness, customer access, stock movement, shutdown windows, monitoring, and maintenance responsibility into one coordinated project plan.
Each guide addresses a different business, site, or implementation decision.
We deliver a project specific to the applicant, connection, property, and operating schedule, with the design and commercial assumptions clearly documented.
Commercial rooftop solar in Hubli connects through HESCOM (Hubli Electricity Supply Company). We handle the feasibility application, single-line diagram, and net-metering or Group Net Metering documentation, and coordinate the HESCOM inspection and meter change. Karnataka permits rooftop net metering up to 1 MW, subject to sanctioned load and connection category.
We identify stable daytime consumption, seasonal changes, cooling or equipment demand, and loads reserved for backup. This produces a more realistic generation and savings case.
Our scope brings roof preparation, electrical readiness, customer access, stock movement, shutdown windows, monitoring, and maintenance responsibility into one coordinated project plan.
Commercial rooftop solar in Hubli connects through HESCOM (Hubli Electricity Supply Company). We handle the feasibility application, single-line diagram, and net-metering or Group Net Metering documentation, and coordinate the HESCOM inspection and meter change. Karnataka permits rooftop net metering up to 1 MW, subject to sanctioned load and connection category.
Group Net Metering may apply to multiple qualifying connections held by one eligible consumer. We review ownership, category, location, metering, allocation, and current utility requirements.
No. Usable area limits capacity, but representative consumption, daytime demand, target connection, sanctioned load, and applicable approvals also shape the design.
We provide the relevant drawings, test and commissioning records, monitoring access, operating guidance, warranty information, and the agreed support or AMC process.
Share recent bills, operating hours, connection details, and basic site information.