Roof and shade
Open sections may still be reserved for future building work, while existing tanks, stairs, and shade can make other sections unsuitable.
Rooftop solar planned for the home and connection that will use it.
For an Amargol home, long-term roof availability is as important as the clear area visible during one visit. Confirmed construction and household plans belong in the first design conversation.
Paso Solar handles the property survey, design, installation, applicable utility support, testing, and handover.
An additional floor, tank relocation, cooling load, or vehicle purchase can affect either the roof or consumption side of the proposal and should be treated separately.
Open sections may still be reserved for future building work, while existing tanks, stairs, and shade can make other sections unsuitable.
We avoid committing roof space for uncertain growth and explain how present bills differ from a scenario that includes confirmed future loads.
The chosen panel area, inverter location, cable path, safety equipment, and space kept for future building work are documented before we start.
Our Approach
We review confirmed upper-floor plans and recommend either a permanent installation zone or a later installation, avoiding a design that depends on relocation.
Final suitability depends on the property, roof rights, target electricity connection, and safe installation access.
Rooftop solar in Hubli connects through HESCOM (Hubli Electricity Supply Company). We prepare the feasibility application, single-line diagram, and net-metering paperwork, and coordinate the HESCOM inspection and meter change. Karnataka allows residential net metering up to the sanctioned load or 10 kW, whichever is lower.
For eligible homes we check and file the PM Surya Ghar: Muft Bijli Yojana subsidy — currently ₹30,000 per kW up to 2 kW and ₹18,000 for the third kW, capped at ₹78,000 for a 3 kW or larger system. Eligibility and the final amount are decided under the scheme.
Continue with property guidance for nearby Hubli-Dharwad areas.
Practical answers about our survey, proposal, utility support, installation, and handover.
If construction changes the roof, access, meter location, or cable route, waiting is often clearer. We can assess whether any permanent zone remains practical before recommending a sequence.
Relocation may be possible, but it requires design review, labour, downtime, and potentially new mounting or wiring. It should not be treated as a cost-free planning option.
Rooftop solar in Hubli connects through HESCOM (Hubli Electricity Supply Company). We prepare the feasibility application, single-line diagram, and net-metering paperwork, and coordinate the HESCOM inspection and meter change. Karnataka allows residential net metering up to the sanctioned load or 10 kW, whichever is lower.
For eligible homes we check and file the PM Surya Ghar: Muft Bijli Yojana subsidy — currently ₹30,000 per kW up to 2 kW and ₹18,000 for the third kW, capped at ₹78,000 for a 3 kW or larger system. Eligibility and the final amount are decided under the scheme.
We test and commission the system, provide monitoring access and relevant project records, explain safe operation, and confirm the agreed warranty and support process.
Share the target electricity bill and property details. Our team will review them before recommending the next step.